santhony7
Member
I am wanting to run a 3” drain pipe under my basement. The pipe needs to run 18’ to reach the main pipe. The main pipe is only about 6.5” below the slab. I know I need about a 4.5” drop at that length. But that would leave me with only 2” of gravel and cement. Any wiggle room in these numbers that would let me accomplish this? Thanks.