ton
Member
- Messages
- 44
- Reaction score
- 0
- Points
- 6
My check point is currently set up at the sand point and it works well. In order to accomdate in line heat trace that i am currently installing I am thinking about installing the check valve near the pump. This would allow me install in line heat trace after the valve all the way down the well below the frost line. If it's installed at the sand point heat trace cannot be fed through a spring loaded valve. Am I going to regret this type of set up for priming reasons. I have a 3/4 hp Jacuzzi (Franklin c series pump)