DanFL
Member
I have a DWV plan as shown in the attached image (IPC in my area). I was originally going to connect the shower drain with a 2" vertical wye as shown, but I don't have the clearance under the slab. Can I instead use a horizontal wye as shown? If yes, which position is correct: wye #1 or wye #2.