908.2 Wet Venting a Bathroom Group (UPC)

Discussion in 'UPC Plumbing Code Questions' started by Michael MacQuigg, Apr 30, 2020.

  1. Michael MacQuigg

    Michael MacQuigg New Member

    Joined:
    Apr 30, 2020
    Location:
    New Mexico, USA
    Hello all. I'm looking for guidance on the attached plumbing configuration for two bathrooms. I had a discussion with a local inspector (UPC, no relevant amendments) who stated that it wouldn't work but did not elaborate.

    908.2.1 My dry vent connection is connected at the bathtub trap arm (dedicated 2-in dry vent at each bathtub) and meets 905.2 and 905.3.
    908.2.2 The discharge into the wet vent includes the lavatory and bathtub (3 dfu)- I read this section as total dfu going into the pipe upstream of the trap that is wet-vented (the toilets)
    908.2.3 Trap arm length on the toilets seem fine (<10 ft), the vent pipe is below the weir but thats ok because its a toilet.
    908.2.4 The toilets (water closet fixture drains) are downstream of other wet-vented fixtures (there are none)
    908.2.5 The kitchen and laundry drain into the 4-in pipe downstream. Those fixtures are conventionally vented.

    wet-vent.jpg
     
    Last edited: Apr 30, 2020
  2. James Henry

    James Henry In the Trades

    Joined:
    Jul 23, 2019
    Occupation:
    Plumber
    Location:
    Billings, Montana.
    Ask him if it would work if their wasn't a vertical offset on your drain.
     
  3. Sponsor

    Sponsor Paid Advertisement

     
  4. Michael MacQuigg

    Michael MacQuigg New Member

    Joined:
    Apr 30, 2020
    Location:
    New Mexico, USA
    Thanks for the response James. I'll ask that when I talk to him again. Is that linked to particular code section or just an impression of something that might be throwing him off?
     
  5. James Henry

    James Henry In the Trades

    Joined:
    Jul 23, 2019
    Occupation:
    Plumber
    Location:
    Billings, Montana.

    Yes, it's in the code, I don't know the section off the top of my head but it's there. I see your trying to plumb back to back bathrooms. Laying a drain on top of a drain is something to be avoided. if the lav and toilet drains were on the same plane he might have approved it.
     
    Last edited: Apr 30, 2020
  6. Jeff H Young

    Jeff H Young Active Member

    Joined:
    Feb 27, 2020
    Location:
    92346
    Im not really up to date on horizontal wet venting as when I did a lot of new home work it wasent code. So it never looks right to me ha ha. But I think the problem is where those 4x2 wyes are and nothing to do with thembeing at the higher elevation. I think the 4x2s need to be between the 4 inch wye and the closet bend. The Lavs and tubs are fine but your W/c s are not vented properly I think you could say the W/C have no vent at all the vent should be taken off downstream upstream dosent count and is not a vent basicaly you just branched off the main and put a toilet in no bueno. Took me a bit of head scratching but thats how I see it .
     
  7. Jeff H Young

    Jeff H Young Active Member

    Joined:
    Feb 27, 2020
    Location:
    92346
    I was thinking this was a bad install but rethinking it as Im not well vered on horizontal wet vents
     
  8. Michael MacQuigg

    Michael MacQuigg New Member

    Joined:
    Apr 30, 2020
    Location:
    New Mexico, USA
    Thanks for the responses. I've been asking around and others have suggested that the ~1' stretch between the two toilets breaks the wet-vent requirements because the second toilet is technically wet-vented by the first. I agree with that, at least in terms of code compliance. However, using a double wye there (instead of the two 4" wyes) would have two waste flows colliding. That seems worse that than the having the short stretch that causes the second toilet to be wet vented by the first. Maybe the inspector could appreciate that?
     
  9. Jeff H Young

    Jeff H Young Active Member

    Joined:
    Feb 27, 2020
    Location:
    92346
    I came into plumbing 30 some years ago we could horizontal wet vent, now that things have changed I never really learned it. So had to back off a bit on this.
     
  10. wwhitney

    wwhitney Active Member

    Joined:
    Mar 17, 2019
    Location:
    Berkeley, CA
    (2015) UPC 908.2 allows horizontal wet venting for a bathroom group. Per the definition in Chapter 2, a bathroom group includes at most one toilet.

    So the problem is the second toilet. If you keep each bathroom group separate, wet venting each toilet, and then combine the horizontal drains further downstream, that should be compliant.

    Cheers, Wayne
     
    Last edited: May 2, 2020
    Jeff H Young likes this.
  11. Jeff H Young

    Jeff H Young Active Member

    Joined:
    Feb 27, 2020
    Location:
    92346
    Thanks Wayne, I get what your saying keeping seperate bathroom groups but is it nessesary to have the wye for the tub and lav downstream of w/c ? or would this been legal if it was the same but just a single toilet? BTW the 2 inch wet vents should have long sweep 90s
     
  12. wwhitney

    wwhitney Active Member

    Joined:
    Mar 17, 2019
    Location:
    Berkeley, CA
    I believe the water closet has to be the last wet vented fixture. From the 2015 UPC:

    908.2.4 Water Closet. The water closet fixture drain or trap arm connection to the wet vent shall be downstream of fixture drain or trap arm connections to the horizontal wet vent.

    Cheers, Wayne
     
  13. Reach4

    Reach4 Well-Known Member

    Joined:
    Sep 25, 2013
    Location:
    IL
    Upstream.
     
  14. James Henry

    James Henry In the Trades

    Joined:
    Jul 23, 2019
    Occupation:
    Plumber
    Location:
    Billings, Montana.

    I think it's one or two bathroom groups unless it has changed. depends on the year.
     
  15. Jeff H Young

    Jeff H Young Active Member

    Joined:
    Feb 27, 2020
    Location:
    92346
    Ok Michael MacQuigg. I got a handle on whats wrong with it but what did you and your Inspector decide?
     
  16. Mr tee

    Mr tee Member

    Joined:
    May 3, 2020
    Location:
    Montana
    I'm too old-timey and too far away from the field to be fluent on horizontal wet vents, but it looks like there are too many turns on the lav for a line without a cleanout.
     
  17. Mr tee

    Mr tee Member

    Joined:
    May 3, 2020
    Location:
    Montana
    Thinking on, it might be simpler to plumb the two bathrooms separately and hook them together downstream.
     
Similar Threads: 9082 Venting
Forum Title Date
UPC Plumbing Code Questions Venting for new bathroom Oct 17, 2018
UPC Plumbing Code Questions Proper Venting for Washer in Bathroom Group (repost correct forum) Apr 20, 2018
UPC Plumbing Code Questions Horzontal wet venting Mar 18, 2018
UPC Plumbing Code Questions Draining and venting 2nd floor bathroom Aug 12, 2016
UPC Plumbing Code Questions Horizontal wet venting bathroom code question Jan 19, 2016

Share This Page