I'm working on a basement shower. The 2" PVC drain (in the concrete foundation) is in one corner of the shower, and I'd like to move it to the center. Measured from inside the drain, the existing drain drops 10.5" below the concrete surface.
I plan to rent a concrete saw and cut a channel...