Hi everyone. Was just looking for some guidance and feedback on a basement rough in. Planning to install a sewage pump in the basement and figured I would add a half bath while I have everything opened up.
Pump is going into the corner of the basement and will be tied into a clean out that is 8’ off the ground.
First connection will be to split off and connect two 2” floor drains. One is going into the boiler room, and second will be near the pump. First question is that the floor drain to the boiler room is about 14’ away. Would I need a vent to tap into this line? Or would it suffice since it’s just a floor drain?
Next connection to the main line will be another wye for the bathroom sink to tap into. Does this layout work to also serve as a vent for the toilet? The vent line from the sink will downgrade to 1.5” and will connect back to the vent line from the sewage pump.
Hope the drawings help to show the layout I was planning. I would welcome any suggestions or recommendations. Thank you in advance!
Pump is going into the corner of the basement and will be tied into a clean out that is 8’ off the ground.
First connection will be to split off and connect two 2” floor drains. One is going into the boiler room, and second will be near the pump. First question is that the floor drain to the boiler room is about 14’ away. Would I need a vent to tap into this line? Or would it suffice since it’s just a floor drain?
Next connection to the main line will be another wye for the bathroom sink to tap into. Does this layout work to also serve as a vent for the toilet? The vent line from the sink will downgrade to 1.5” and will connect back to the vent line from the sewage pump.
Hope the drawings help to show the layout I was planning. I would welcome any suggestions or recommendations. Thank you in advance!