Skhunt42
New Member
Hello, long time lurker and first time poster. I’m installing a new vanity and the drain sits too low. I have an option of cutting a fairly large hole in the cabinet (particle board) to clear the p-trap but I would like to weigh out my options. An s-trap is against code here in California.
I have the drywall torn out already and I figured it would be a good idea / beneficial to replace a section of the cast iron with ABS since it’s already exposed.
Would it be in acceptable to just cut where the red lines are and run a no hub coupler? Are there any reasons to actually cut the lead joint and run a donut instead?
I have the drywall torn out already and I figured it would be a good idea / beneficial to replace a section of the cast iron with ABS since it’s already exposed.
Would it be in acceptable to just cut where the red lines are and run a no hub coupler? Are there any reasons to actually cut the lead joint and run a donut instead?
Last edited: