cyrus-the-virus
New Member
- Messages
- 11
- Reaction score
- 0
- Points
- 0
I have added an addition onto the side of my house. The problem I am wrestling with is how to layout the waste/vent line for the toilet, sink and bathtub. I am located in New Jersey and the wall at the back of the toilet is a load bearing wall. The joists below are 12" TGI's 16" O/C. The walls are all framed in 2x4s.
The wall behind the toilet and the wall to the right of the toilet are exterior walls.
As you can see from the diagram, I would like to vent horizontally from the right side of the toilet and up the stud wall, but I am not sure I have enough space for the necessary 90 degrees to get up the stud wall (15"). The vents will then meet in the attic space as a 3" vent up through the roof.
After I get your advice, I will layout the components and provide another picture.
The wall behind the toilet and the wall to the right of the toilet are exterior walls.
As you can see from the diagram, I would like to vent horizontally from the right side of the toilet and up the stud wall, but I am not sure I have enough space for the necessary 90 degrees to get up the stud wall (15"). The vents will then meet in the attic space as a 3" vent up through the roof.
After I get your advice, I will layout the components and provide another picture.