Cris2017
New Member
I have a cpl quick questions:
First what are the different options to install a shower valve while using ProPEX Uponor.
I can go to the supply lines and up to the shower head with 1/2 PEX line, but I cannot go to the tub spout with 1/2, so if I don't want to solder copper, is there any other option than running 3/4" line from valve to bath spout?
Second, any concerns about running 3/4 throughout the house and splitting to 1/2 at lav/toilet/shower?
Thank you so much for all input!
First what are the different options to install a shower valve while using ProPEX Uponor.
I can go to the supply lines and up to the shower head with 1/2 PEX line, but I cannot go to the tub spout with 1/2, so if I don't want to solder copper, is there any other option than running 3/4" line from valve to bath spout?
Second, any concerns about running 3/4 throughout the house and splitting to 1/2 at lav/toilet/shower?
Thank you so much for all input!
Last edited by a moderator: