Drain Under Slab P Trap

Users who are viewing this thread

carl2000

New Member
Messages
2
Reaction score
0
Points
1
Location
Utah
I’m adding a shower drain to the basement, tying into the 4 inch main. Which layout is better (if any)? I’m running out of room below the slab for the vent line—stack up is too much. Option 2 gives more room to re-pour the concrete, but is the P-trap below the 4 inch main OK?

Option 1 is roughed in but not glued in the pictures. The 1 1/2 vent is 2 inches below the concrete surface.
 

Attachments

  • IMG_4474.jpeg
    IMG_4474.jpeg
    60.3 KB · Views: 30
  • IMG_4472.jpeg
    IMG_4472.jpeg
    92.6 KB · Views: 29
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks