Nick154154
New Member
I'm in the middle of a repipe and redoing the dwv at the moment. I've got a situation where my waste from my bathroom needs to do a 180 to tie into the lines going to the city. Right now I have a 3" combo on the line going to the street, and 2 street 45's to that to tie in from above and its slightly rolled. Trying to determine if there is a better solution.
Thanks!
Thanks!
Last edited: