    Horizontal sewage ejector piping before reaching final drain?

    Hi, How much level horizontal can I use on a sewage ejector setup before reaching the final drain? The builder's tie in for the basement bathroom is a horizontal stub out, half way into the joist bay, connected to the main drain. The issue is that where they put the ejector pit and bathroom...
  2. Chris Curtin

    Basement shower instead of roughed in tub

    Hi, The builder roughed in a full bath in the basement, but setup it up for a tub instead of a shower. We want a shower with a center drain. Is it okay to use a wye and a 90 to connect the shower drain to where the tub used to be? Or a pair of 45's? I know we need to remove the p-trap under the...
  3. Chris Curtin

    Adding lights to existing circuit while finishing the basement

    Hi, I have a permit to finish the basement. In the county I live there is only the rough in inspection, then the final approval. No separate electrical inspection. Homeowner can do their own electrical in GA. The basement has 6 existing lights, of course in the wrong place for what we're...
  4. Chris Curtin

    Running vent across basement ceiling

    Hi, I'm designing the basement finishing and have an interesting problem. The builder put in an ejector pit, stubbed bathroom, drain extension, vent extension, capped water lines etc. on the upper left side of the basement. My wife wants a full kitchen on the right side. Using a pump to push...
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks