If there is no disconnect at the meter then it is not the first disconnect, it is simply a meter and socket in a metal enclosure. Many POCOs used to require that the GEC (grounding rods or equivalent) connect at the meter. Now most don't allow it. The NEC allows the GEC to connect at the...