Hello SewerRatz. I am replacing all the plumbing in a two unit a building from the basement to the second floor. The second floor has a kitchen sink, bathroom sink, shower and toilet. The first floor is exactly the same. The basement has a shower, toilet, bathroom sink and utility sink. Now I plan on using 2" and 4" pvc. Can you tell me how I would run all the drains and vents?