Chefwong
Member
So ...new checkvalve in the basement. Hopefully, this will the end all - be all to sewer water backup flooding in the basement.
It's happens once every 6- 8 years...
10" Wide plant wood flooring is getting ripped out
Anyhow, after the Finished flooring (tile), how common or not , does someone cut the drywall higher up .....and just let the baseboard cover it. I'm inclined to have the sheetrock cut 3/4 - 1 1/4" cut higher than the finished flooring. This way, it kinda will at least not be a sponge to the water should I ever get water again. I've been smitten by this whole mold/remodel situation.
Crazy idea of common practice on some parts of the world.
It's happens once every 6- 8 years...
10" Wide plant wood flooring is getting ripped out
Anyhow, after the Finished flooring (tile), how common or not , does someone cut the drywall higher up .....and just let the baseboard cover it. I'm inclined to have the sheetrock cut 3/4 - 1 1/4" cut higher than the finished flooring. This way, it kinda will at least not be a sponge to the water should I ever get water again. I've been smitten by this whole mold/remodel situation.
Crazy idea of common practice on some parts of the world.