hosky
New Member
- Messages
- 32
- Reaction score
- 0
- Points
- 0
Hey guys! I am going with the "no dumb question theory" here.
I have a 1800 ft well that is pumping sand (made posts about it before) and I need a new well. The well guy wants to drill a 350 - 600 foot well.
Two questions:
1) If the 1800 well is pumping sand can I move over an acre or so and get water art 600?
2) (Dumb question) Can we pull the pipe out of the 1800 and just replace the pipe down to about 600? Wouldn't that be the same as moving over a few yards and redrilling?
Thanks, Hosky (don't laugh too hard!!)
I have a 1800 ft well that is pumping sand (made posts about it before) and I need a new well. The well guy wants to drill a 350 - 600 foot well.
Two questions:
1) If the 1800 well is pumping sand can I move over an acre or so and get water art 600?
2) (Dumb question) Can we pull the pipe out of the 1800 and just replace the pipe down to about 600? Wouldn't that be the same as moving over a few yards and redrilling?
Thanks, Hosky (don't laugh too hard!!)