iwantawell
New Member
If you switch to cable tool drilling, then stay with at least a 5 or 6 inch bore so that it can take a standard sub.
Lets say there is some sand or gravel below. Wouldnt the wet mud and clay above it contaminate it? From all my studying everyones sandpoint wells on webpages amd youtube, i get that they go through topsoil then loam then gravel or sand. Whereas i hit really thick clay, then mud. So is it simply game over for anything shallow?
What does loam even look like