I am installing new toilet and flange to an existing 3" turned-up CI 90 closet bend in a concrete basement floor. The existing closet bend is set uneven (one edge of pipe opening is about 1/8" higher than the other), so that when the new flange is seated squartely on the bend, it is sloped almost 1/4" from actual level edge-to-edge.
Can this be corrected short of excavating & resetting existing bend & drain line? Specifically, can adjustments be made in the bend to flange connection to bring it level, eg. grind down high end to level? If not, can the uneveness be compensated for at the flange to closet connection, eg. extra thick wax ring?
Thanks.
Can this be corrected short of excavating & resetting existing bend & drain line? Specifically, can adjustments be made in the bend to flange connection to bring it level, eg. grind down high end to level? If not, can the uneveness be compensated for at the flange to closet connection, eg. extra thick wax ring?
Thanks.
Last edited: