shower base installation

Users who are viewing this thread

DAVE A

New Member
Messages
1
Reaction score
0
Points
0
Hello! I am installing a mustee shower base (32x48) onto a concrete floor. The drain pipe is sticking straight out of the concrete. The problem is that the bottom of the base is not flat. It has about a 4" deep protrusion where the pipe goes in the center of the base. The instructions say that if installing onto a wood floor that I must cut a 5" hole to accomodate this protrusion. Should I chisel out the concrete aroiund the pipe or would I be better off just getting a different base?
 
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks