Hi,
I am redoing the master shower and had to relocate the 2" drain which leads into a 3" stack. All ABS. I tried to make the least number of turns. Please critique and let me know if you see any problems the way I did it. It will be a rainshower with jets so I need to make sure it drains well.
Thanks
I am redoing the master shower and had to relocate the 2" drain which leads into a 3" stack. All ABS. I tried to make the least number of turns. Please critique and let me know if you see any problems the way I did it. It will be a rainshower with jets so I need to make sure it drains well.
Thanks