Rmk9785e
Member
This may be very basic but I am doing it for the first time and don't want to mess it up because of the fast acting chemicals. I'm replacing some leaking Schedule 40 PVC plumbing of my pond pump/filter setup and need to understand the correct sequence to cement the components together. Enclosed are photos of the original and what I have connected so far. I've measured and cut the pipe pieces to the best of my ability but there may be some room for error. I tried dry fitting but it is very tight and doesn't go all the way even though I have deburred all ends.
How should I do it to ensure it is all level and correctly aligned?
How should I do it to ensure it is all level and correctly aligned?