Hello,
As part of a basement finish project, I’ve got a toilet flange set in concrete that is 14.5 inches to the side wall. So, once drywall is up it will be 14 inches to center, which is an inch short of code.
Trying to decide best approach from these options:
1. Do nothing, see if it passes inspection
2. Break up the concrete and put it where it should be
3. Use an offset flange to cover the 1 inch it’s off
Anyone have thoughts on an offset flange cs breaking up the concrete (or just leaving it)?
Will
As part of a basement finish project, I’ve got a toilet flange set in concrete that is 14.5 inches to the side wall. So, once drywall is up it will be 14 inches to center, which is an inch short of code.
Trying to decide best approach from these options:
1. Do nothing, see if it passes inspection
2. Break up the concrete and put it where it should be
3. Use an offset flange to cover the 1 inch it’s off
Anyone have thoughts on an offset flange cs breaking up the concrete (or just leaving it)?
Will