Tuttles Revenge
In the Trades
- Messages
- 4,247
- Reaction score
- 1,485
- Points
- 113
What you're suggesting, building an overflow using a WYE fitting after the tub shoe, in your hand, is exactly how I built mine when I had to move my tub over and still have the drain hit the trap. I found a photo of the tub that I had to build the same thing since they moved the tub after it was originally installed and I broke the waste and overflow that came with the tub.
I've seen some absolutely terrible drains from the factory, so you're likely to do much better.
I've seen some absolutely terrible drains from the factory, so you're likely to do much better.