BMWpowere36m3
Member
I've remodeled my house and moved the original bathroom… my plan was to bring the "new" waste line outside thru the foundation and tie into the existing sewer line. The sewer line runs all the way to the back of the house where the original main stack was (only draining the kitchen waste and a basement washing machine into that line).
The new waste stack is 3" (shower, bathtub, lav and toilet). I wanted to bring that 3" line thru a combo and out the foundation to tie into the 6" sewer line. What's the best way to connect the 3" PVC sch 40 pipe thru the foundation to the SDR-35 pipe (6"). I was looking for a SDR-35 wye fitting with a sch 40 inlet… but haven't found anything.
The new waste stack is 3" (shower, bathtub, lav and toilet). I wanted to bring that 3" line thru a combo and out the foundation to tie into the 6" sewer line. What's the best way to connect the 3" PVC sch 40 pipe thru the foundation to the SDR-35 pipe (6"). I was looking for a SDR-35 wye fitting with a sch 40 inlet… but haven't found anything.