Planning stages of basement bathroom. Here is a photo of the corner area I have picked out.
-The purple is the existing 4" running in the slab. The location is confirmed via camera.
-That stack on the left of the photo is all vent pipe above the upper 4" San-T. So I can tie into that to vent this bath group.
-The brown is the estimated framing.
-You can see the location I want to put the toilet and lav. The shower will be a 36" x 60" in the corner where the shelving is.
Here is a real photo of the basement.
-The purple is the existing 4" running in the slab. The location is confirmed via camera.
-That stack on the left of the photo is all vent pipe above the upper 4" San-T. So I can tie into that to vent this bath group.
-The brown is the estimated framing.
-You can see the location I want to put the toilet and lav. The shower will be a 36" x 60" in the corner where the shelving is.
Here is a real photo of the basement.