I have a 1/2 bath rough-in in a basement. I have the space to create a full bath. Is is possible to add a shower without breaking the concrete floor for drainage? Can the shower be raised, step up and in? That way all the drainage goes under the step and into the wall? Also, I have been reading about venting. I'm assuming that showers have to be vented too. What can that be tied to? It is not sewer water, so can it be tied to the sink vent? I'm not a plumber by any stretch but I'm also making the assumption that a "rough-in" bath has all the venting for the sink too.
Thanks,
Scott
Thanks,
Scott