Search results

  1. Firstcut

    Tub P Trap Height

    Need to move to new location, about 36 inches. under slab If I remove old P, run horizontal 2 inch for 36 " to new spot, I will need slope on that 36" run which means new Ptrap will be about 1 inch higher than old one. Is that a problem, or is there a better method? I don't think I want...
  2. Firstcut

    Rainbird Troubleshoot

    New to using Irr.system. The Rainbird has 3 zones which cycle on, however one zone does not come on at all, it goes dormant for the cycle, then next zone comes on as expected. Was working fine last fall. What steps to troubleshoot?
  3. Firstcut

    Moving Tub on Slab

    I want to re-locate tub, its concrete slab, drain is now directly in the slab. I need to move it about 12-16 inches. Choice #1 : Break up concrete. Choice #2 : Since it may be a design feature, can I use the present drain if the new tub location is raised approx. 12 inches in a framed...
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks