Search results

  1. A

    Redoing Boiler piping

    Hi All, New to the Forums! I am in process of re-piping hydronic system. System is 10 years old gv-6 series 2 boiler ( 153,000 DOE). Currently p/s piping with boiler loop done in 1 in copper and t's spaced 12 in apart into secondary system. secondary is a 2 in copper manifold parallel...
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks