Well casing bonding

Users who are viewing this thread

phughes200

Engineer
Messages
54
Reaction score
0
Points
6
Location
NC
I had a 405' a 6" well drilled last week set 25' from the house. The casing is unscreened steel and is 64' set 10' into rock. The pump is 3/4 set at 240'. The electrical supply is 12/2. The water supply is PEX.

Does the well casing have to be bonded to the equipment ground?
 
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks