Chefwong
Member
I've been searching for a pic with no success....
Anyone care to post one.
I originally roughed a drain at 16" OC for a 32 sink base.
The Sink Base location is not changing but it will be a 36" Base.
As well, the drain on the new sink is offset all the way on the right end of the sink.
What the proper way on offseting the trap ?
Is it the same wastearm piece turned towards the other end of the sink - extension and the usual p trap/tailpiece ?
Anyone care to post one.
I originally roughed a drain at 16" OC for a 32 sink base.
The Sink Base location is not changing but it will be a 36" Base.
As well, the drain on the new sink is offset all the way on the right end of the sink.
What the proper way on offseting the trap ?
Is it the same wastearm piece turned towards the other end of the sink - extension and the usual p trap/tailpiece ?