I am trying to replace a couple of hose outlets with frost free sill cocks. Existing are hose bibb sweated to 1/2" copper. The hole through the poured foundation is about 3/4" in diameter and needs to be 1 1/8" in diameter for the sill cock install.
Any suggestions on how to ream out the hole to the larger size? the concrete is older (1920 vintage house) and about 10" thick.
I may have the option to raise the position of the sill cock about 12" and go through the brick and box joist. I could plug the old hole with some hydraulic cement.
Ideas?
Thanks,
Joel
Any suggestions on how to ream out the hole to the larger size? the concrete is older (1920 vintage house) and about 10" thick.
I may have the option to raise the position of the sill cock about 12" and go through the brick and box joist. I could plug the old hole with some hydraulic cement.
Ideas?
Thanks,
Joel