Ok, on to Round 2. I've abandoned the idea of using a combination waste and vent design (even though I'm under IPC, which seems much laxer than the UPC on this subject). To further simplify the DWV, I have Hand Sink #1 draining indirectly into Floor Sink #1, and Hand Sink #2 draining indirectly...