f_armer
New Member
- Messages
- 22
- Reaction score
- 0
- Points
- 1
There seems to be alot of discussion on basements, so I'll throw my dilema in the ring.
I am in a rural area, tied to a septic system.
My basement never had any provisions for a bathroom, only a floor drain.
I have a 3" main stack in the area where I want to add a toilet sink and shower. Above tied into this stack is a toilet sink and bathtub.
For now I would like to rough in the, in floor, part of the job and would like some insight.
I would like to have a plumber come in and have a look, but right now that is almost impossible because they all seem to be extremely busy.
Hopefully my drawing will help show what I want to do.
The 2" line is about 8' long to give a perspective. Is this anything close to what might be required?
OK let me have it
I am in a rural area, tied to a septic system.
My basement never had any provisions for a bathroom, only a floor drain.
I have a 3" main stack in the area where I want to add a toilet sink and shower. Above tied into this stack is a toilet sink and bathtub.
For now I would like to rough in the, in floor, part of the job and would like some insight.
I would like to have a plumber come in and have a look, but right now that is almost impossible because they all seem to be extremely busy.
Hopefully my drawing will help show what I want to do.
The 2" line is about 8' long to give a perspective. Is this anything close to what might be required?
OK let me have it