monkeystomach
New Member
Hi Everyone,
I am going to install a new Kohler 304 valve. I had planned on soldering all the pipes (1/2†copper) to the new valve… should I continue with that plan or can I thread everything together since the ends of the valve all have threads?
Also, I'm a little confused with the depth of the valve in the wall. I read over Kohler's instructions but they are not very clear. Right now I have 2x4 studs and plan on installing 1/2 drywall with Kerdi over that, then the tile... What would this be considered a thin or thick finished wall?
Thanks,
Ed
I am going to install a new Kohler 304 valve. I had planned on soldering all the pipes (1/2†copper) to the new valve… should I continue with that plan or can I thread everything together since the ends of the valve all have threads?
Also, I'm a little confused with the depth of the valve in the wall. I read over Kohler's instructions but they are not very clear. Right now I have 2x4 studs and plan on installing 1/2 drywall with Kerdi over that, then the tile... What would this be considered a thin or thick finished wall?
Thanks,
Ed