    Hi There,

    My wife and I are redoing our upstairs bathroom due to several mistakes made by the prior owners. The most major of which was cutting two floor joists in half in order to perform a plumbing repair:
    [​IMG] !

    Here's a horrible drawing of the bathroom layout and the plumbing the way that it was:
    [​IMG]

    Pink = Fixtures, with the toilet being in the far corner
    Blue = joists
    Red = existing drain lines
    Green = cut joists

    So the 5 million dollar question is how does one get the drain pipe from the tub end of the bathroom to the toilet drain?

    Thanks so much,
    Gil
    Sistering joists in steamy CT
  2. gilmil

    gilmil New Member

    Messages:
    16
    Location:
    ct
    After reading some posts I'm going to work on a 3D diagram of this and post it sometime soon.
  3. jastori

    jastori New Member

    Messages:
    118
    Location:
    Illinois
    edit: Ooops... I think I misread... if you need to pass a 3" drain line through the joists, it is significantly more difficult, but may be still possible. It is certainly preferable to avoid having a 3" or 4" drain pass through joists.

    ----

    You should be able to drill holes for the tub drain to pass through the floor joists without causing structural problems. The common code requirement for drilling holes is to stay 2" away from top and bottom of joist, with max. hole diameter less than 1/3rd joist height (note: notching guidelines are significantly more restrictive). For a 2x10 or 2x12 floor joist, you should be able to safely drill for a 1.5" or 2" drain line to run the tub drain line through the joists.

    The link below has code requirements for notching and drilling studs. I think their diagram is consistent with 2003 IRC.
    http://www.ci.bloomington.mn.us/handouts/53/53znotch.pdf
    Last edited: Jun 18, 2010
  4. jadnashua

    jadnashua Retired Defense Industry Engineer xxx

    Messages:
    22,262
    Location:
    New England
    There is a potentially significant additional criteria about when and where you can drill holes in the joists...they can't be within x of the ends of the span (don't remember the x). In the middle of the span, the majority of the strength in stiffness is from the top expanding, and the bottom compressing, but at the wall edges, you need to account for the point loads of the walls, so holes there are more of a problem (and for probably other reasons, I've forgotten!).
  5. hj

    hj Moderator & Master Plumber Staff Member

    Messages:
    27,034
    Location:
    Cave Creek, Arizona
    My first requirement would be to physically see the house and the installation. There are things not shown in the picture or the drawing which might impact how to do it, such as which end has the tub drain, and why? One indication that it was NOT a plumber who did it is the use of a bushing to connect the drain to the closet bend fitting.
    Last edited: Jun 19, 2010
  6. gilmil

    gilmil New Member

    Messages:
    16
    Location:
    ct
    The layout was the original to the house, or at least was galvanized drain pipe and some brass water pipes. The drain for the tub is at that end because there is a window on the other end of the tub. We decided to keep the layout the same, but it was brought up to code.
Similar Threads: routing drain
Forum Title Date
IPC Plumbing Code Questions double bathroom sinks and washing machine through 2 inch drain - no vent - okay? Sep 11, 2013
IPC Plumbing Code Questions Venting emergency drain. Feb 4, 2013
IPC Plumbing Code Questions Underslab drain replacement not deep enough for current code Nov 7, 2012
IPC Plumbing Code Questions Branch drain sizing Oct 20, 2011

Share This Page