Plumbing in new addition question.

Discussion in 'Plumbing Forum, Professional & DIY Advice' started by Larry4, Nov 20, 2008.

  1. Larry4

    Larry4 New Member

    Messages:
    24
    Hi, Larry here. Im starting the plumbing in a new addition. Im asking if I can vent a shower stall and toilet with a 2" vent. The shower stall and toilet line up in the same basment joist bay 7.5' apart. I was going to come down the back wall with the vertical 2" dry vent which goes directly up and out roof, 90 degree into the basement joist, go 1' and covert to 3" waste. From that point go 1' more and wye in the shower trap. From shower trap 5.5' to 3" toilet and wye in with 3". From there 1.5' and wye into the main soil line going out. Basiclly everthing lines up in a row with the vent starting in the back and direction of flow going towards the toilet. Hope this makes some sense. Thanks for all your help.

    Larry
  2. nhmaster

    nhmaster Master Plumber

    Messages:
    3,189
    Location:
    S. Maine
    No part of the vent may run horizontally until it has risen to at least 6" above the flood level rim of the highest fixture served.
Similar Threads: Plumbing addition
Forum Title Date
Plumbing Forum, Professional & DIY Advice Plumbing Remodel & Bathroom Addition May 7, 2014
Plumbing Forum, Professional & DIY Advice Plumbing new bathroom in my own addition need help please. Dec 9, 2013
Plumbing Forum, Professional & DIY Advice Help with general plumbing layout for Bathroom Addition Aug 16, 2010
Plumbing Forum, Professional & DIY Advice Addition Bath Plumbing Drainage? Mar 24, 2009
Plumbing Forum, Professional & DIY Advice Custom Shower addition plumbing questions Oct 8, 2008

Share This Page