    Can a professional plumber plumb new construction regardless of the floor plan. is there always a way to accomplish the plumbing.
  2. 10 times out of 10, yes. If the framer doesn't make allowances for certain crucial drain stacks in the home, the framer has to come back and either move joists or header them off to make it work. Floor plans designed by any architect, engineer, carpenter hold a large part of the responsibility of how things *mesh* in the design and planning of DWV systems installed by plumbers.

    Short of a electric chain saw or sawzall, all things are possible with a plumber. :eek: :D
  3. hj

    hj Moderator & Master Plumber Staff Member

    Messages:
    26,843
    Location:
    Cave Creek, Arizona
    plumbing

    As I told a carpenter foreman on one job where the rough floor was also the final floor, "You can cut the opening I need to put the plumbing in, or I can do it. The only difference will be that I will not worry about how you will be able to put it back." All things are possible, as long as you do not get discouraged.
Similar Threads: Plumbing floor
Forum Title Date
Plumbing Forum, Professional & DIY Advice Feedback on plumbing floor plan layout-advice needed May 3, 2014
Plumbing Forum, Professional & DIY Advice Main Floor Washer/Sink plumbing setup question Aug 9, 2013
Plumbing Forum, Professional & DIY Advice plumbing a toilet on an uneven floor? Jul 22, 2013
Plumbing Forum, Professional & DIY Advice plumbing 3 new toilets from 1st and second floors Jan 28, 2012
Plumbing Forum, Professional & DIY Advice Second floor plumbing plans and pics....please help. Jun 21, 2011

Share This Page