Telemarkjim
New Member
Good Evening, much lurking, first posting. Plumbing shower to be tiled over kerdi. Just where do you locate the drop ell relative to the backer board ? I mean should it protrude into the backer board, where you could caulk it right to said board. Or should you leave it deep in the 2x4 wall, say plumb with the shower valve and let the nipple reach out. This is for a shower head, handheld shower and a couple a body spritzers. Oh yea, and is 1.28 gals. from the Guinevere really gunna take it all to the septic tank ? Thank you in advance.
Last edited by a moderator: