Hi, first timer here hope someone can help!!!
well we decided to remodel our bathroom(first timeDIY's) which also is our laundry room with the hot water heater, the problem is in order to repair and tile floor,where the washer and dryer and water heater sits we will have to move them out for a period of time. The floor in that area need some extra prep for tile work, we have moved the washer and dryer out (into livingroom ) I can deal with that but were not sure how to temporaly relocate the water heater?? it is a 50 gal directvent gas heater which is vented now to the outside , we really don't have too many options we are a family of four teen and preteen who will want showers as do we, back to what we think may be our only options
1. move it a couple feet to another part of the bathroom while we work on and finish that part of tiling, which means rerouting pipes, gas pipes and vents
2.move it outside right on the other side of that wall which feels like a whole lot of trouble, pilot light staying lit stability of outside ground to name a couple.
we're at a loss needless to say this has not been our first obstacle but i think the biggest!!!!
any advise ASAP would be greatly appreciated!!!
well we decided to remodel our bathroom(first timeDIY's) which also is our laundry room with the hot water heater, the problem is in order to repair and tile floor,where the washer and dryer and water heater sits we will have to move them out for a period of time. The floor in that area need some extra prep for tile work, we have moved the washer and dryer out (into livingroom ) I can deal with that but were not sure how to temporaly relocate the water heater?? it is a 50 gal directvent gas heater which is vented now to the outside , we really don't have too many options we are a family of four teen and preteen who will want showers as do we, back to what we think may be our only options
1. move it a couple feet to another part of the bathroom while we work on and finish that part of tiling, which means rerouting pipes, gas pipes and vents
2.move it outside right on the other side of that wall which feels like a whole lot of trouble, pilot light staying lit stability of outside ground to name a couple.
we're at a loss needless to say this has not been our first obstacle but i think the biggest!!!!
any advise ASAP would be greatly appreciated!!!