I had a home built 2 years ago with a un finished basement that was preplumbed. Here is what I am looking at and let me know if this sound OK. IN the full bath, I have water line for the sink, toilet and tub. Coming up from under the concrete I have PVC pipe for the vanity sink, toiler and tub. Now all of this feeds into a basin located in the mech room. The basin is not hooked up yet and does not yest have a motor. In the mech room I have to pipes running down from up above, one labeld drain and one labeled vent. The vent is solo and runns all the way to the ceilint.
Is the only vent that I need the one coming from the basin/ejector pump to this dedicated vent pipe?
Is the only vent that I need the one coming from the basin/ejector pump to this dedicated vent pipe?