Baseboard install

Discussion in 'HVAC Heating & Cooling' started by renooner, Dec 29, 2008.

  1. renooner

    renooner New Member

    Joined:
    Dec 22, 2008
    Hi everyone, my questions is how far off the sub-floor do you place the bottom of the baseboard? Embassy baseboard, Indiana location. Thanks, Eric
     
  2. frenchie

    frenchie Jack of all trades

    Joined:
    Dec 30, 2006
    Occupation:
    Caretaker
    Location:
    Brooklyn, NY and Fire Island, NY
    That depends on what you're using as finish flooring.

    Personally, I run my baseboards after the finish floor.
     
  3. Sponsor

    Sponsor Paid Advertisement

     
  4. nhmaster

    nhmaster Master Plumber

    Joined:
    Jul 30, 2008
    Occupation:
    Tech. Instructor
    Location:
    S. Maine
    I usually hold it up 3/4" from the sub floor. That allows pretty much any finished flooring to be installed.
     
Similar Threads: Baseboard install
Forum Title Date
HVAC Heating & Cooling Baseboard heat Dec 20, 2014
HVAC Heating & Cooling Connecting a new radiant heat zone for a garage slab to an existing baseboard boiler heating system Nov 12, 2014
HVAC Heating & Cooling Electric Baseboards or Central LP Furnace? Oct 20, 2014
HVAC Heating & Cooling Can I change to regular hot water baseboard heaters? Aug 5, 2014
HVAC Heating & Cooling My house has all the copper baseboard going in a weird double loop. Mar 15, 2014