Search results

  1. djterm

    total (approximate) 2400ft water line with total (approximate) 400ft elevation change

    Hi everyone. This is a real situation with an unimproved parcel of land that I currently have under contract and within the due-diligence period. I believe this is a difficult question. What I am trying to do is determine what it would take to supply the yet-to-be-built 3 bedroom/2 bath home (no...
  2. djterm

    total (approximate) 2400ft water line with total (approximate) 400ft elevation change

    Hi everyone. This is a real situation with an unimproved parcel of land that I currently have under contract and within the due-diligence period. I believe this is a difficult question. What I am trying to do is determine what it would take to supply the yet-to-be-built 3 bedroom/2 bath home (no...
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks