Edmonton_david
New Member
Hello friends,
from what I have learned thru researching on the internet. it suggested the Wye are not to be use in a vertical position to make transition from horizontal to vertical (fixture outlet to waste stack). How does Pic 3 below PASS inspection?
I am located in Edmonton Alberta, Canada
the Garage is heated.
The work was done by certified Plumber - it PASS- but I want to understand HOW it pass
Please see the following pic below.
from Garage into the home.
inside the home, pipe along the Wall,
2" along the wall, 1.5" vent pipe, 2" waste stack
Wye installed on VERTICAL position-- HOW DOES this meet code?
from what I have learned thru researching on the internet. it suggested the Wye are not to be use in a vertical position to make transition from horizontal to vertical (fixture outlet to waste stack). How does Pic 3 below PASS inspection?
I am located in Edmonton Alberta, Canada
the Garage is heated.
The work was done by certified Plumber - it PASS- but I want to understand HOW it pass
Please see the following pic below.
from Garage into the home.
inside the home, pipe along the Wall,
2" along the wall, 1.5" vent pipe, 2" waste stack
Wye installed on VERTICAL position-- HOW DOES this meet code?