Zimm0who0net
Member
I'm putting in a drain to an auxiliary building. In my front yard I've got one of those double cleanout things (looks like a U where the upper cleanout is for going toward the street and the lower cleanout is for going toward the house). I'd like to tie into this line somewhere. I'm wondering which of these options are available (this will be inspected)
1. Tie my branch in to one of the cleanouts themselves somewhere between the bottom of the U and grade (the bottom of the U is approximately 3-1/2' below grade)
2. Tie in below the U (i.e. between the U and the street).
3. Tie in above the U (i.e. between the U and the house).
1. Tie my branch in to one of the cleanouts themselves somewhere between the bottom of the U and grade (the bottom of the U is approximately 3-1/2' below grade)
2. Tie in below the U (i.e. between the U and the street).
3. Tie in above the U (i.e. between the U and the house).