Venting - toilet then shower then vent

Users who are viewing this thread

JAMS

New Member
Messages
4
Reaction score
0
Points
1
Location
Connecticut
I'm trying to work a waste line around a beam/joists and my current solution: toilet (3" line), then shower (2"), then vent (2"). I can change the order to: toilet, vent, shower. Will either work with the IPC?

The vent goes vertical right after the wye and if needed, I may be able to make the vent line 3".
IMG_20170329_113425.jpg
youdoodle-2017-03-29T11-41-10Z.jpg
 

JAMS

New Member
Messages
4
Reaction score
0
Points
1
Location
Connecticut
Thanks hj, that's what I was thinking, but could not be sure.

Would swapping the vent and tub line locations make a difference?
 

JAMS

New Member
Messages
4
Reaction score
0
Points
1
Location
Connecticut
Thanks again. Would this layout work? The tub now has its own vent that comes before the main waste line. The two vent lines will join up when they go vertical

youdoodle-2017-03-30T09-40-01Z.jpg
.
 
Last edited by a moderator:
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks