Can someone explain how the venting would look for this basement stub-in?
The above image shows the layout, the line marked “sink†is what I hoped to use for the sink drain. But, there is also another 2†line by the toilet. There is also a line above marked “future vent†that is either 1 ¼ or 1 ½â€.
You can see from this image everything drains into and ejector pit
The vent line is just above the line I have marked for the sink
Shows the plumbing above the stub-ins. I have the ejector drain and vent labeled backwards on the image
The above image shows the layout, the line marked “sink†is what I hoped to use for the sink drain. But, there is also another 2†line by the toilet. There is also a line above marked “future vent†that is either 1 ¼ or 1 ½â€.
You can see from this image everything drains into and ejector pit
The vent line is just above the line I have marked for the sink
Shows the plumbing above the stub-ins. I have the ejector drain and vent labeled backwards on the image