SteveFrench
New Member
2nd story master bath remodel. I’m planning to do a 60x44 shower on the window wall (currently plumbed for this) and planning on moving the toilet between where it’s at now and where the current vanity plumbing is.
I really want to be able to put a 48 inch double sink vanity in behind the shower location where the chain lights are hanging but i don’t see any way to make the plumbing work and still be up to code. The only other place i can put the vanity is to extend the plumbing to come through the vent duct closet in the third picture and put the vanity where the linen closet is currently.
Does anybody have any recommendations or tips for where to put the vanity and how to plumb it?
I really want to be able to put a 48 inch double sink vanity in behind the shower location where the chain lights are hanging but i don’t see any way to make the plumbing work and still be up to code. The only other place i can put the vanity is to extend the plumbing to come through the vent duct closet in the third picture and put the vanity where the linen closet is currently.
Does anybody have any recommendations or tips for where to put the vanity and how to plumb it?