wwhitney
In the Trades
Say I have a set of horizontal drains (already vented) converging towards a single location and I want to combine them and turn downward into a single vertical drain.
If it's just two drains approaching from opposite directions, I could use a double quarter bend. But suppose it's a different configuration (two drains approaching at right angles, or three drains). And suppose I have a single or double san-tee with the appropriate sanitary side inlets (not straight). Is there anything wrong with using the san-tee to connect all the drains, and just plugging the unused top inlet?
I can't think of any code issue, but I'm not familiar with all the code sections.
Cheers, Wayne
If it's just two drains approaching from opposite directions, I could use a double quarter bend. But suppose it's a different configuration (two drains approaching at right angles, or three drains). And suppose I have a single or double san-tee with the appropriate sanitary side inlets (not straight). Is there anything wrong with using the san-tee to connect all the drains, and just plugging the unused top inlet?
I can't think of any code issue, but I'm not familiar with all the code sections.
Cheers, Wayne