Tom E Bray
New Member
I'm roughing in a grade level 2 pc. Bath room on concrete.i have a picture of the layout .I connecting it with a existing 3inch underground abs .can vent either fixtures on any wall but the long steel stud wall .thanks for any insite on the matter