Kadip
New Member
Hi.. trying to install an Am Std 60” alcove tub. Waste pipe with drain assembly inserted seems about 1/2 inch too high. Can i just use a PVC pipe cutter 1.5 inch pipe and take an inch or so out of the waste pipe, then put on a new threaded piece? Pic attached. Wanted to use a pro but plumber quoted $1900 to install tub. Room is totally gutted, square and floor leveled, wall and floor behind and under tub are open for total access. Is that price normal? It seems to me like max 2.5 hours work if that. Thanks for your ideas as to whether i could do the PVC cut as references above.
Last edited by a moderator: